Skip To Translation Selection Skip To Top Navigation Skip To Content Skip To Footer
Campus Alert
Campus Updates


Elevator Service Restored in Building 71

All three elevators in Building 71 have been repaired, fully tested and returned to service. Normal use of the building may resume.



UDC Facilities Update

At this time, a definitive timeline for reopening Buildings 32 and 42 has not been established. The reopening of these facilities remains contingent upon the successful completion of repairs, testing, inspections and confirmation that the affected electrical distribution equipment can be safely re-energized.

For safety concerns, contact OPSEM at 202-274-5050. For emergencies, call 911.

Full details

President Edington

President Edington's Vision for UDC

President Edington’s Bold Goals for UDC’s Future

UDC will deliver on the promise:

  • Of a world-class flagship university for the nation’s capital.
  • Of being a national model for urban student success.
  • Of being the District’s workforce and economic mobility engine.
  • Of being a research and innovation hub addressing the District’s critical needs.
  • Of uniting all University stakeholders in support of a shared vision for One UDC.

Delivering on the Promise

The University of the District of Columbia’s new five-year strategic plan, Delivering on the Promise, is a product of President Maurice D. Edington’s vision, along with deep collaboration and dedication from a remarkable group of stakeholders from across the university, the District and the region. Their collective effort reflects a deep commitment to UDC’s future.

Read the Plan
Back to Top
Take The Next Steps, Today!